Rate Monotonic Scheduling
Rate monotonic scheduling assigns priorities to tasks on the basis of their periods.
Highest-priority task is the one with the shortest period
- Lower bound on schedulable utilization = 0.693
Rate monotonic scheduling assigns priorities to tasks on the basis of their periods.
Highest-priority task is the one with the shortest period